some of the SPC floor edges was broken after only 2 years use. Upon open the broken planks we noticed there is no leveling process on the subfloor. We repaired the broken area only instead of replacing whole floors. Saved 70%+ for the owner.
13×13 tile on plywood floor.
The old floor cleaned, seal painted self-leveled.
Sealant applied on new floor.
Same 5″ wide tile for baseboard, edged with metal trim.